Action Plans

As part of the update of the Countywide Transportation Plan (CTP), the Regional Transportation Planning Committees, or RTPCs, are updating their Action Plans for Routes of Regional Significance. The Action Plans represent a joint plan for addressing the impacts of new development on the region's freeways, arterials, transit and trails. Each identifies:

  • A system of Regional Routes, those freeways, arterials and other main connections among Contra Costa's communites and surrounding region
  • Adopted Multi-modal Transportation Service Objectives (MTSOs) that use a quantifiable measure of effectiveness and include a target date for attaining the objective
  • Specific actions to be implemented by each participating jurisdiction to achieve the MTSOs
  • Requirements for consultating on environmental documents 
  • Procedures for reviewing proposed local General Plan amendments that influence the effectiveness of adopted Action Plans

The Action Plans help local jurisdictions meet the requirement in the Authority's Growth Management Program that local jurisdictions engage in cooperative, multi-jurisdictional planning.

The RTPCs developed the first Action Plans in the early 1990s and updated them in 1999-2000 and 2009. To view the 2009 Action Plans and download drafts of the updated Action Plans below.

SB743 changed how transportation impacts are identified in environmental documents.  To respond to these changes, the Authority has asked the RTPCs to look at the draft Action Plans and consider changes to the MTSOs to respond to SB 743. The letter to the RTPCs can be downloaded below.

 

  • Download 2009 Lamorinda Action Plan Update
  • Download 2009 Central County Action Plan
  • Download 2009 West County Action Plan
  • Download 2009 East County Action Plan
  • Download 2009 Tri-Valley Action Transp. & Action Plan Update
  • CCTA's Letter to RTPCs re: SB743