The proposed project will increase the capacity of this intersection to accommodate heavy traffic flows on Clayton Road during the peak commute periods. It will allow the opposing left-turn movements from Treat Boulevard and from Denkinger Road to be serviced simultaneously, hence enabling the shortening of the signal cycle length at this intersection and improving the system-wide signal coordination along Clayton Road during peak periods.