State Route 4 Integrated Corridor Management (ICM)

Through the use of leading technologies such as adaptive ramp metering, advisory speed signs, coordinated traffic signals and transit signal priority, the project is designed to maintain efficient traffic flow on State Route 4 from State Route 160 to Interstate 80.
  • Download comprehensive fact sheet