St. Mary's Road Improvements

This project constructed circulation, drainage, and safety improvements in nine phases along the length of the existing two-lane roadway corridor. The corridor includes the following roadways: 1) Olympic Boulevard from Pleasant Hill Road to Reliez Station Road, 2) Reliez Station Road from Olympic Boulevard to Glenside Drive; 3) Glenside Drive from Reliez Station Road to St. Mary’s Road; and 4) St. Mary’s Road from Glenside Drive south to the city limits.

Major widening and realignment was not required. Items of work included left-turn lanes, access improvements at intersections, shoulder work, drainage, walkways, and slope stabilization.