Monument/I-680 Bicycle and Pedestrian Improvement Study

CCTA is working with the TRANSPAC Committee to develop a feasibility study to identify specific improvements to the bicycle and pedestrian connections on the Monument Boulevard Corridor across I-680. This is a heavily-traveled roadway, including high-speed freeway ramps, with minimal facilities for non-motorists.

This gap in the active transportation network was identified in the Countywide Bike Plan, and would provide for an improved east-west connection between Pleasant Hill and Concord across I-680. The study area includes Monument Blvd. between Mohr Lane/Iron Horse Trail and Contra Costa Blvd. and includes other equivalent parallel routes used to travel and access this section of the Monument Corridor.